Skip Navigation
This table is used for column layout.
06-27-12 Planning & Zoning Commission Regular Session Agenda
Town Council Chambers
Begins: 7:30 P.M.



REGULAR SESSION AGENDA
PLANNING AND ZONING COMMISSION
JUNE 27, 2012


1.   CALL TO ORDER

  • APPROVAL OF MINUTES
  • Design Review Minutes – June 13, 2012
  • Regular Session Minutes- June 13, 2012
3.  SPECIAL PERMIT APPLICATION – Under sections 205.1(d) to allow conversion    
     from a filling station repair facility to a filling station with a convenience store on land         
     located at 451 School Street.
    Assessors Map # 39 Lot #108
    Applicant: Mohammad Raza
     (Tabled from the June 13, 2012 Meeting)

4.  SITE PLAN APPLICATION – 451 School Street, Installation of new store front  
     entrance and sloped walk to an existing automobile filling station.
    Applicant: Wasu LLC by Mohammad I. Raza
    (Tabled from the June 13, 2012 Meeting)

5.  MAJOR FLOOD HAZARD ZONE DEVELOPMENT PERMIT APPLICATION  
     - East Hartford Flood Control System, To allow repairs at railroad closure & Main    
     Street closure structures, repairing the concrete floodwall at the Riverpoint    
     Condominium complex, removing vegetation, repairing animal burrows, replacing rip    
     rap on riverside surface of the    levee, relocation fencing and guardrails, minor re-
     grading & sod repair on levee system, and abandoning utilities in front of the   
     Riverpoint Condo floodwall.
    Applicant: Town of East Hartford; Timothy A. Bockus, Director of     
                       Public Works


6.  NATURAL RESOURCES APPLICATION - East Hartford Flood Control System,  
     To allow repairs at railroad closure & Main Street closure structures, repairing the    
     concrete floodwall at the Riverpoint Condominium complex, removing vegetation,   
     repairing animal burrows, replacing rip rap on riverside surface of the levee,  
     relocation fencing and guardrails, minor re-grading & sod repair on levee system, and   
     abandoning utilities in front of the Riverpoint Condo floodwall.
    Applicant: Town of East Hartford; Timothy A. Bockus, Director of Public Works

7.  SOIL EROSION AND SEDIMENTATION CONTROL APPLICATION - East          
     Hartford Flood Control System, To allow repairs at railroad closure & Main Street    
     closure structures, repairing the concrete floodwall at the Riverpoint Condominium   
     complex, removing vegetation, repairing animal burrows, replacing rip rap on   
     riverside surface of the levee, relocation fencing and guardrails, minor re-grading &  
     sod repair on levee system, and abandoning utilities in front of the Riverpoint Condo   
     floodwall.
    Applicant: Town of East Hartford; Timothy A. Bockus, Director of Public Works

8.  8-24 REFERRALS
  • Easment Acquistions for roadway drainage and public sidewalks adjacent to 1-5 Riverside Drive.
  • Civil works and closure structure repair projects East Hartford flood protection system
  • Improve East Hartford Tax Incentive Program.

9.  MISCELLANEOUS

10.  ADJOURNMENT